Work in progress.=C2=A0 Will let you know =
when ready for review.=C2=A0
Maddie
From: =
Raim Izhar [mailto:rizhar@siengineering.com]
Sent: Friday, =
June 12, 2015 5:35 PM
To: m@r6catalyst.com; =
zack@r6catalyst.com
Subject: RE: SI Engineering website =
update
Maddie and Zack,
Hope all is well. I was just taking a look at the website and =
just had two comments:
=C2=B7 =
Can the slider just contain the three images/titles from the three =
projects mentioned in the other email?
=C2=B7 =
The project pages don=E2=80=99t all seem to have the exact same =
format/content. I like the format of some that I=E2=80=99ve seen, =
but I was unsure of which one we were going to use as the =
standard.
Have a great weekend!
Best,
Raim
From: Raim =
Izhar [mailto:raim.izhar@gmail.com] =
Sent: Monday, June 08, 2015 9:51 AM
To: rizhar@siengineering.com
=
Subject: Fwd: SI Engineering website =
update
———- Forwarded message =
———-
From: maddie chandran <m@r6catalyst.com>
Date: Fri, =
Jun 5, 2015 at 3:29 PM
Subject: SI Engineering website update
To: =
Raim Izhar <raim.izhar@gmail.com>, =
"Zack@r6" <zack@r6catalyst.com>
http://sie-demo.com.s151514.gridserver.com/#=
Items =
Discussed, 6/05/2015
1. Move email =
and phone number closer to Menu bar to reduce white space; remove top =
grey bar completely.
2. Cut height =
of slider to 50% for visibility to text
3. Change =
images on sliders
4. Change =
tagline below slider with project titles
5. Services =
Drop down =E2=80=93 change background color to match Menu bar background =
=E2=80=93 grey
6. Increase =
text font color by 20% to make it =
darker
7. Increase =
font size of Project headings (in the grey box) to match size of service =
headings
8. Increase =
size of images in the Projects (grey box) area if =
possible
9. Remove the =
teal highlight below A in =E2=80=9CAbout =
SIE=E2=80=9D
10. =
Remove last line in the wordings below services write up =
to increase white space (MC)
Timeline:
Pictures =
selection =E2=80=93 Raim =E2=80=93 Mon, June 8
All edits, =
per discussion =E2=80=93 Zack =E2=80=93 Thu, June =
11
Inside =
Projects page preliminary design =E2=80=93 Zack =E2=80=93 Tue, June =
16
Follow =
=E2=80=93up phone discussion =E2=80=93 Thursday, June 18 (time to be =
decided)
Call me =
with any questions.
~M
— =
Raim Izhar
University of Illinois at =
Urbana-Champaign | Class of 2016
College of Engineering | =
Civil Engineering
College of Business | =
Business Minor
Beta Theta Pi Fraternity | =
President
raim.izhar@gmail.com | =
862-485-6902